{"id":2306,"date":"2026-04-01T10:40:23","date_gmt":"2026-04-01T10:40:23","guid":{"rendered":"https:\/\/www.fittich.ch\/projects\/tunnels-autoroutiers\/"},"modified":"2026-04-01T10:40:23","modified_gmt":"2026-04-01T10:40:23","slug":"tunnels-autoroutiers","status":"publish","type":"projects","link":"https:\/\/www.fittich.ch\/fr\/projects\/tunnels-autoroutiers\/","title":{"rendered":"Tunnels autoroutiers"},"content":{"rendered":"<p>Les tunnels autoroutiers du Tessin \u2014 Stalvedro, Piottino, Pardorea, Casletto, Piumogna, Biaschina, Ceneri, Melide-Grancia, Vedeggio-Cassarate, Ascona et Mappo Morettina (actuellement en construction) \u2014 sont prot\u00e9g\u00e9s par le syst\u00e8me de d\u00e9tection lin\u00e9aire de feu \u00e0 fibre optique de derni\u00e8re g\u00e9n\u00e9ration de Fittich. Dans la plupart des tunnels, les locaux techniques sont \u00e9galement prot\u00e9g\u00e9s par des syst\u00e8mes de d\u00e9tection incendie. Le syst\u00e8me de d\u00e9tection incendie des tunnels d\u00e9tecte \u00e0 la fois la pr\u00e9sence de fum\u00e9e et l\u2019augmentation des temp\u00e9ratures gr\u00e2ce \u00e0 deux syst\u00e8mes distincts et ind\u00e9pendants, permettant une intervention rapide des pompiers et activant automatiquement des dispositifs de s\u00e9curit\u00e9 tels que les feux de signalisation, la ventilation et l\u2019\u00e9clairage de secours.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les tunnels autoroutiers du Tessin \u2014 Stalvedro, Piottino, Pardorea, Casletto, Piumogna, Biaschina, Ceneri, Melide-Grancia, Vedeggio-Cassarate, Ascona et Mappo Morettina (actuellement en construction) \u2014 sont prot\u00e9g\u00e9s par le syst\u00e8me de d\u00e9tection lin\u00e9aire de feu \u00e0 fibre optique de derni\u00e8re g\u00e9n\u00e9ration de Fittich. Dans la plupart des tunnels, les locaux techniques sont \u00e9galement prot\u00e9g\u00e9s par des syst\u00e8mes [&hellip;]<\/p>\n","protected":false},"featured_media":2307,"template":"","project_category":[17],"class_list":["post-2306","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_category-industrial-logistics-infrastructure"],"_links":{"self":[{"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/projects\/2306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/media\/2307"}],"wp:attachment":[{"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/media?parent=2306"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.fittich.ch\/fr\/wp-json\/wp\/v2\/project_category?post=2306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}